Project Name
Sohar - Wadi Algezzi Road
The Project aims at containing the increasing traffic movement, secure the integrity of the existing two-way road and improve the road path to increase the speed from 80 km/h to 120 km/h to secure the integrity of the road. The project involves the construction of a two-way 81-km road from Falj Al Qabael Roundabout in Sohar city to Al Tharub roundabout that is 20 km away from Al Buraimi city. It includes the building of an additional track as wide as two lanes.