Widening and Extension of Sheikh Zayed Highway (Improvement of 16th December Junction)
Project Description
The project involves the construction of a 208-metre dual bridge, comprising three lanes in each direction, along Sheikh Salman Highway at its intersection with 16th December Avenue and Sheikh Zayed Highway (GDT Junction).
The scope includes road construction, slip roads, ramps, earthworks, retaining walls, road signage and markings, safety barriers, drainage, street lighting, utility relocation, landscaping and other associated works, as detailed in the Tender Documents.
Eligibility
The tender is open to eligible UAE contractors classified under the First Category for Roads and Bridges Works, Bahraini contractors classified under Category AA for Road Works, and qualifying joint ventures with Bahraini or international contractors, subject to the requirements outlined in the Tender Documents.
Submission
Tender Documents must be purchased and bids submitted electronically through the Bahrain Tender Board portal: https://etendering.tenderboard.gov.bh
Bids must be submitted in two separate envelopes (Technical and Financial). The original Bid Bond must be delivered to the Tender Board before the closing date, with a copy uploaded through the electronic system.
All submissions must comply with the requirements and conditions set out in the Tender Documents.