Sign In

Project details

Arpa-Seven Tunnel
  • Country
  • Armenia
  • Year
  • 2007
  • Sector
  • Transportation
  • Status
  • In Progress
  • Project Type
  • Loan
Overview

The project is aimed at assisting in achievement of ecological stabilization of the lake by raising the water level by 6 m in an effort to make up for the losses experienced through evaporation and over exploitation of the lake. The lake is used in provision of water for domestic and irrigation purposes in addition to supporting the fishery sector. The lake also plays an important part in the live of the Armenian community. The project works consist of rehabilitation and refurbishment of 49 km long Arpa-Sevan hydraulic tunnel with its control and the operating equipments. The tunnel divert about 250 million cubic meter of water from Arpa and Yeghegis rivers to feed Lake Sevan.

Other projects in